Haileybury College, Berwick campus lost all power as a result of water damage to the main switchboard caused by a large storm overnight. They immediately got in touch with Macmor Electrical, and we took care of the problem.

Solution:

  • Macmor Electrical Contractors were in attendance within one hour of the power outage and set about cleaning the unaffected sections of the switchboard, removing the damaged parts caused by the explosion
  • Macmor sourced two 500 kVa generators, temporary switchboards and supply cables to power the sub circuits that supplied power to the school
  • Working through the night, Macmor reinstated power to all sub circuits and business resumed as normal the following morning
  • Once the temporary generators were in place, Macmor designed, manufactured and delivered a new main switchboard
  • Within two weeks, the temporary solution was disconnected and the new switchboard was installed
  • The new main switchboard was designed with the schools future power requirements in mind