Trinity Grammar – Tudor Centre

About the Project

New Build Project

In 2011, Macmor was awarded a $1.2 million, two-year contract to build a new facility at Trinity Grammar. This included a library, additional learning spaces, staff offices, and a dedicated Robotics/Technology zone

The Macmor team delivered:

  • An effective lighting solution including automated lighting control
  • A structured CAT6 Voice/Communications installation
  • An electrical installation (including fire alarm system) that complied with the architect’s design, the school’s requirements and all relevant electrical standards
  • Wiring systems that were concealed within the concrete structure for each building level
  • Surface mounted cabling installed with the use of steel flexible conduits, adding aesthetic appeal