New Build Project
In 2011, Macmor was awarded a $1.2 million, two-year contract to build a new facility at Trinity Grammar. This included a library, additional learning spaces, staff offices, and a dedicated Robotics/Technology zone
The Macmor team delivered:
- An effective lighting solution including automated lighting control
- A structured CAT6 Voice/Communications installation
- An electrical installation (including fire alarm system) that complied with the architect’s design, the school’s requirements and all relevant electrical standards
- Wiring systems that were concealed within the concrete structure for each building level
- Surface mounted cabling installed with the use of steel flexible conduits, adding aesthetic appeal